Aapua henndu nokku
Appearance
Aapua henndu nokku
| Lesdi | Suwed |
|---|---|
| Nder laamoore | Övertorneå Municipality |
| Jonde kwa'odineto | 66°51′45″N 23°32′14″E |
| Powered by | Vestas V82-1.5 MW |
| Service entry | 2005 |

Aapua Wind Farm (e ɗemngal Suwed: Aapua-parken) ko nokku henndu to Eta, to fuɗnaange-rewo Aapua, e nder wuro Övertorneå e nder diiwaan Norrbotten, to leydi Suwed. Haa e hitaande dubi 2007, ko kañum woni nokku ɓurɗo heewde henndu e nder leydi Suwed.[1] Ndema kaa ko Aapua Vind AB jeyi ɗum, ina lomtoo 14 jom jawdi en, ina golloroo e leydi ndi laamu jeyi Sveaskog, jom ladde ɓurɗo mawnude e leydi Suwed.[2] Ngesa oo fuɗɗii golle ko e hitaande dubi 2005[3]
Karallaagal
[taƴto | taƴto ɗaɗi wiki]Feere ndee ina waɗi jolɗe jeeɗiɗi 1,5 MW Vestas V82-1,5 MW tawi doole mum en kollitooje ko 9,9 MW (10,5 MW e fawaade e balloowo Vestas [4]. Kala yuɓɓo ina jogii tooweeki nacelle 78 m e njaajeendi rotor 82 m. [4]
Himobe
[taƴto | taƴto ɗaɗi wiki]- ↑ Rothberg, Ole; Andersson, Mikael (2007-12-22). "Het vindkraft sätter snurr på det gamla varvet". Dagens nyheter (in Swedish). Stockholm. Archived from the original on 2007-08-15. Retrieved 2008-01-03.CS1 maint: unrecognized language (link)
- ↑ "Rusning till Sveaskog efter bra vindkraftlägen - Ny Teknik". Archived from the original on 2011-06-08.
- ↑ "Placera Nu Sveaskog: Medvind för vindkraft i skogsmiljö". Archived from the original on 2011-07-19. Retrieved 2007-12-24.
- 1 2 Cite error: Invalid
<ref>tag; no text was provided for refs namedvestasbrochure