Avedøre Holme Offshore Wind Farm

Iwde to Wikipedia
Avedøre Holme Offshore Wind Farm
offshore wind farm
LesdiDanemark Taƴto
Nder laamooreHvidovre Municipality Taƴto
Jonde kwa'odineto55°36′8″N 12°27′40″E Taƴto
Owned byØrsted Taƴto
OperatorØrsted Taƴto
Map

Avedøre Holme, ko nokku henndu ɓadiiɗo maayo, saraaji maayo Avedøre, Kopenhag. Nde fuɗɗii golloraade ko e hitaande 2009 e 3,6 MW Siemens tati ngam eɓɓaande[1] hollitoore ngam ƴettude henndu e nder geec garoowo.[2][3][4][5][6] Ørsted owns two turbines, and a private collective owns the third.[2] Ørsted and partners build a 2MW hydrogen electrolysis station at Avedøre Power Station supplied by Ørsted's two turbines.[7] Ørsted ina jogii turbineeji ɗiɗi, koolol keeriiɗo ina jogii tataɓol ngol.

Ørsted e wondiiɓe mum ina mahi 2MW elektorolisis hidrogen to nokku Avedøre mo turbineeji ɗiɗi Ørsted ndokki.

  1. "Capacity factors at Danish offshore wind farms". energynumbers.info. March 2019.
  2. 1 2 "Hvidovre Vindmøllelaug". hvidovrevindmollelaug.dk. Retrieved 8 March 2017.
  3. Spliid, Iben B. Data on operating and decommissioned wind turbines (as at end of September 2010) Archived 2014-08-02 at the Wayback Machine (.xls spreadsheet) Danish Energy Agency, 18 October 2010. Main page Archived 2013-04-15 at the Wayback Machine Retrieved: 25 October 2010.
  4. Operational offshore wind farms in Europe, end 2009 EWEA. Retrieved: 23 October 2010.
  5. Christensen, Allan S. & Madsen, Morten. Supply Chain study on the Danish offshore wind industry Archived 2016-05-15 at the Portuguese Web Archive page 33-42 Offshore Center Denmark, 29. august 2005. Retrieved: 23 October 2010.
  6. "Avedøre Holme - 4C Offshore". 4coffshore.com. Retrieved 8 March 2017.
  7. Wittrup, Sanne (20 December 2019). "Ørsted bygger brintfabrik ved Avedøre". Ingeniøren (in Danish).