Boco Rock Wind Farm
Appearance
Boco Rock Wind Farm
| Golle imaaɗe | 2015 |
|---|---|
| Lesdi | Osterliya |
| Nder laamoore | New South Wales |
| Jonde kwa'odineto | 36°34′48″S 149°4′48″E |
| Owned by | Electricity Generating Public Company Limited |
| Significant event | construction |
| Operator | CWP Renewables |
| Powered by | GE 1.6-82.5, GE 1.7-100/103 |
| Service entry | 2015 |
| Laawol ngol laamu anndani | https://www.bocorockwindfarm.com.au/ |

Henndu Boco Rock ko nokku henndu 10 km to fuɗnaange-rewo Nimmitabel e nder diiwaan Snowy Mountains to Galles du Sud, to Ostarali. Ina waɗi 67 GE 100-1.7 henndu toowndu hub 80m, ina soomi haa 113MW kuuraa. Ko ƴellitooɓe ɗum, CWP Renewables njiylotoo ɗum kono jooni ko EGCO jeyi ɗum.[1]
Kontraa innjiniyaaruuji, soodgol e mahngo ngam werlaade henndu nduu, yaltinaama e lewru suwee 2013 e juuɗe fedde GE e Downer EDI. Laana ndiwoowa ka ɓe keɓata ka, ko kañum waɗata e EnergyAustralia ngam yeeyde ɗum.[2]
Golle
[taƴto | taƴto ɗaɗi wiki]Feere henndu ndee fuzzii yaltinde grid ko e lewru ut 2014, nde fuzzii golle mum haa timmi e lewru noowammbar 2014, nde woni ko e golle jokkude gila ndeen. Tablo yonta huutortoo ko eljmkt nemlog ngam heɓde nafooje yonta kala lewru.
Tuugnorgal
[taƴto | taƴto ɗaɗi wiki]- ↑ "Boco Rock Wind Farm". Retrieved 27 September 2019.
- ↑ "GE and Downer partner to deliver $350m Boco Rock Wind Farm". Sustainability Matters. 28 June 2013. Retrieved 27 September 2019.