Crudine Ridge Wind Farm
| Lesdi | Osterliya |
|---|---|
| Nder laamoore | New South Wales |
| Location | Sallys Flat |
| Jonde kwa'odineto | 32°57′58″S 149°38′10″E |
| Owned by | CWP Renewables |
| Powered by | General Electric 3.6-137 |
| Service entry | 2021 |
| Laawol ngol laamu anndani | https://cwprenewables.com/our-projects/crudine-ridge-wind-farm |

Koolol henndu Crudine Ridge ko nokku henndu 134 MW, ko CWP Renewables mahi ɗum, jeyi ɗum sara Sallys Flat, 45 km to fuɗnaange Mudgee to leydi Ostarali. Ina waɗi 37 werlaa henndu, heen gooto fof ina jogii 3,63 MW.[1] Toweruuji ɗii ina njogii 91,5 meeter toowɗo, ina njogii 137 meeter njaajeendi rotor, e tooweeki tippudi 160 meeter. Golle njulaagu puɗɗii ko e cakkital hitaande 2021. Hitaande kala, ina ɗaminaa maa ɗum heɓ 392 GWh e mbaadi 33,4% e nder teemedere.[2]
Golle Feere henndu ndee winnditii yaltinnde adannde e lewru desaambar 2020[3], nde yettii yaltinnde timmunde e lewru sulyee 2021, nde golliima haa jooni gila ndeen.[3] Tablo yonta huutortoo ko eljmkt nemlog ngam heɓde nafooje yonta ,[4][4][5]
Yimɓe henndu Crudine Ridge (MWh) Hitaande Total Jan Feb Mar Abriil Mee Jun Jul Aug Sep Oktoobar Nov Dec 2020 1,862 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0 1,862* 2021 270.650 2.435* 9.957* 13.627* 14.365* 15.224* 23.749 35.931* 36.110 34.385 31.194 31.0424 22 Tesko : Asterisk hollitii doole yaltuɗe ina pamɗi e nder lewru nduu.[6]
Tuugnorgal
- ↑ "CRURWF1.. : NEM Unit Output (MW)". nemlog.com.au. Retrieved 2022-01-14.
- ↑ Ltd, Spicy Web Pty (2021-10-06). "Crudine Ridge Wind Farm, NSW". CWP Renewables (in Engeleere). Retrieved 2021-10-09.
- ↑ "CRURWF1.. : NEM Unit Output (MW)". nemlog.com.au. Retrieved 2022-01-14.
- 1 2 Cite error: Invalid
<ref>tag; no text was provided for refs named:1 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs named:02 - ↑ "CRURWF1.. : NEM Unit Output (MW)". nemlog.com.au. Retrieved 2022-01-14.