Formosa 2 Offshore Wind Farm

Iwde to Wikipedia
Formosa 2 Offshore Wind Farm
offshore wind farm
Golle imaaɗe1 Siilto 2022 Taƴto
LesdiTaiwan Taƴto
Located in or next to body of waterTaiwan Strait Taƴto
Jonde kwa'odineto24°42′58″N 120°46′32″E Taƴto
Owned byJERA, Macquarie Bank Taƴto
Service entry21 Mbooy 2023 Taƴto
Laawol ngol laamu anndanihttps://formosa2windpower.com/, https://formosa2windpower.com/en/ Taƴto
State of usein use Taƴto
Map

Formosa 2 Offshore Wind Farm (sinuwaa gaadanteejo; Sinuwaa koolaaɗo: 376 MW ko nokku henndu to bannge maayo ina woni sara diiwaan Miaoli, to leydi Taiwan.

Technical specifications

[taƴto | taƴto ɗaɗi wiki]

The wind farm consists of 47 generating units. Each of its turbine will have a 167-meter diameter rotor and 81.5 meter blades, with a swept area of 21,900 m2, with a rated capacity of 8 MW.

Jan De Nul rokkaama golle innde, soodgol, e mahngo ngam sosde fonndasiyoŋ e jolngo kaɓirɗe les maayo e lewru suwee 2019. E lewru sulyee hiitande dubi 2019, Seajacks International heɓiino gollal Siemens Gamesa ngam jolnude e jolnude turbineeji henndu e LS Cable & System rokkaama golle ngam jolnude kaɓirɗe henndu e lewru suwee hiitande dubi 2019. Ko Jan De Nul rokki Sembcorp Marine Offshore Platforms e Saipem ngam feewnude fonndaasiyoŋ jacket e lewru suwee 2019 e lewru noowammbar 2019. E lewru oktoobar 2019, Seaway 7 ko Jan De Nul rokki ɗum golle ngam nawde e sosde fonndaasiyoŋ jacket oo e lewru oktoobar 2019.

Udditgol kaalis eɓɓaande ndee waɗi ko e lewru oktoobar 2019. Golle mahngo dow leydi puɗɗii ko e lewru desaambar 2019, golle mahngo dow maayo puɗɗii ko e feccere adannde hitaande 2020.

Eɓɓaande ndee joofiima, udditaa ñalnde 16 lewru nduu, ina ɗaminaa maa nde rokku fotde 380 000 galle doole.2020.[1][2]

Fedde henndu nduu ina woni e 9,5 km to bannge maayo diiwaan Miaoli.[3]

Sifaaaji karallaagal

[taƴto | taƴto ɗaɗi wiki]

Fedde henndu nduu nder waɗi 47 njuuteendi. Kala turbine mum maa jogo rotor mo njaajeendi mum tolnii e 167 meeter e 81,5 kiloomitajir tawi njaajeendi mum ko 21 900 m2, tawi mbaawka mum tolniima e 8 MW.

Semmbeeji kesi to leydi Taiwan

Doole henndu to leydi Taiwan

Sektoraaji kuuraa to leydi Taiwan

  1. "Formosa 2 Offshore Wind Farm". NS Energy. Retrieved 16 February 2022.
  2. "Formosa 2 Offshore Wind Farm". Power Technology. 4 December 2020. Retrieved 16 February 2022.
  3. "Taiwan's third offshore wind farm officially inaugurated". Focus Taiwan. Archived from the original on 16 May 2023. Retrieved 17 May 2023.