Great Eppleton Wind Farm
Appearance
Great Eppleton Wind Farm
| Lesdi | Biritaani-Mawndi |
|---|---|
| Historic county | County Durham |
| Jonde kwa'odineto | 54°49′59″N 1°25′46″W |
| Laawol ngol laamu anndani | http://www.eon-uk.com/generation/greateppleton.aspx |

Feere henndu mawnde Eppleton ko nokku henndu sara Eppleton mawɗo, Tyne e Wear, Angalteer. Ko E.ON UK jeyi ɗum, ina gollina ɗum. Nde mahiraa ko e hitaande dubi alif 1997, nde teskaa ko e fuɗɗoode nde waɗi ko turbineeji ɗiɗi, sibu ko ɓuri heewde e turbineeji henndu ina njogii ƴiye tati. Ñalnde 29 suwee, E.ON hollitii wonde maa lomto ɗeen turbineeji nay kesi REpower MM92 rokki mbaawka innde 8,2 MW.[1]
Tuugnorgal
[taƴto | taƴto ɗaɗi wiki]- ↑ "New turbines set to boost Sunderland wind farm output". New Energy Focus. 30 September 2009. Archived from the original on 5 January 2011. Retrieved 4 July 2020.CS1 maint: unfit url (link) - "UKWED Operational wind farms". RenewableUK. Archived from the original on 2 November 2012. Retrieved 4 July 2020. - "Wind farm upgrade plan revealed". BBC News. 10 January 2007. Retrieved 4 May 2010.