Jump to content

Stockyard Hill Wind Farm

Iwde to Wikipedia
Stockyard Hill Wind Farm
onshore wind farm
LesdiOsterliya Taƴto
Nder laamooreVictoria Taƴto
Jonde kwa'odineto37°32′9″S 143°15′4″E Taƴto
Map

Feere henndu Hill Stockyard

Ayaare

Ngewte

Jaangugo

Waylu iwdi

Yiytu daartol

Kuutorɗe ina cuuɗii

Fu

Ko jokkondiri ɗoo

Waylooji jowitiiɗi heen

Jokkorde duumiinde

Kabaaru hello

Siftor ngoo hello

Heɓ URL juutɗo

Sosde kode QR

Yaajnude fof

Waylu jokkorɗe hakkunde ɗemɗe

Tappirde/yaltinde

Sosde ɗum e PDF

Version mo mbaaw-ɗaa tappirde

E nder eɓɓooji goɗɗi

Piye Wikidata

Nafoore suuɗde

Wolde

Pamarron

Je aandin

Manga

Yajjol

Je aandin

Yaaji

Nokkuure (beta)

Otomatik

Anoora

Balwi

Habrirde caɗeele e mbaadi niɓɓiri

Koolondiral : 37°32′9′′S 143°15′5′′F

Gila e Wikipedia, ansiklopiiji ɗi ngalaa njoɓdi

Feere henndu Hill Stockyard

Kartal

Wikimedia | © Kartal laabi udditiiɗi

Lesdi

Ostarali

Koolondiral 37°32′9′′S 143°15′5′′E

Darnde Golle

Pewnugol ngol fuɗɗii ko e lewru mee 2018

Joom en Palisade ko gollodiiɓe njulaagu (49%)

Doole Nebras (49%)

Henndu kaŋŋe Ostarali (2%)

Operateer Goldwind Ostarali

Gese henndu

Winndu e dow leydi

Toowgol hub ko 110 meeter

Njaajeendi rotor oo ko 140 meeter

Yiyngo doole

Yunituuji gollorɗi 149 × 3,57 MW

Waɗde e mbaydi henndu kaŋŋe GW140-3,57MW

Capanɗe innde 530 MW

Faktore mbaawka 40,9% (ina teskaa)

Ko yaltata hitaande kala ko 1900 GWh (ina fotnoo waɗeede)

Jokkondire yaajɗe

Lowre ndee ko www.stockyardill.com.au

[waylu e Wikidata]

Feere henndu Stockyard Hill ko eɓɓoore henndu to Victoria (Ostarali).[1] E lewru oktoobar 2022 eɓɓaande ndee timminii jarribooji mum hold point, nde jaɓaama e Operateer Lugge Enerji Ostarali e Dowlaaji Dentuɗi ngam ƴellitde haa ɓura 511MW e nder Lugge Enerji Ngenndiije.

Ko Windpower Ostarali fuɗɗii ƴellitaare ndee, ko Origin Energy soodi ɗum. E lewru mee 2017, Origin soodi ƴellitaare ndee e Goldwind Australia fotde 110 miliyoŋ dolaar Amerik, siifondiri nanondiral coodgu semmbe ngam soodde kuuraa e seedanteeje semmbeeji kesi ko famɗi fof 60 dolaar Amerik/MWh.[2]

Koolol ngol ina waɗi 149 jolngo henndu jaɓaango e nokku ko ina tolnoo e 35km bannge worgo Ballarat hakkunde Beaufort e Skipton.[3] Njeeygu nguu ina teskaa ko 900 miliyoŋ dolaar Amerik (750 miliyoŋ dolaar Amerik)[4] E lewru desaambar 2009, peeje gadane ɗee ko 242 turbine, peeje ɗee mbaylaama haa 157 turbine tan njogii. Jaagorgal peewnugol leydi Victoria jaɓii 157 turbineeji ɗii, e lewru oktoobar 2010.[5]

E hitaande 2013 Origin miijinoo yeeyde eɓɓaande ndee hade peewnugol ngol fuɗɗaade, kono fellitii jokkude eɓɓaande ndee.[6]

Pewnugol ngol fuɗɗii ko e lewru mee 2018 e dow diisnondiral ina waɗi 149 werlaa henndu.[7] Turbineeji cakkitiiɗi ɗii mbaɗi ko e lewru Duujal 2020, golle ɗee puɗɗii ko e lewru Siilo 2021. Turbineeji Goldwind 3S ina njogii mbaawka 3,57 MW,[8][9] e tooweeki hub ko 110 meeter, tooweeki tip ko 180 meeter, e njaajeendi rotor ko 40 meeter. Feere ndee ina foti soodde 1900 GWh e hitaande kala,[10] e mbaadi mbaawka ko ina wona 40,9 %. Ma ɗum doole ko ina tolnoo e 425 000 galle hitaande kala.[11] Origin Energy ina jogii nanondiral soodgol doole ngam soodde denndaangal kuuraa haa hitaande 2030.[12]

Feere henndu ndee winnditii ƴellitaare mum adannde e lewru sulyee 2021. E lewru suwee 2022, feere henndu nduu yettiima 508,4MW, walla 99,49% e ƴellitaare mum ɓurnde mawnude winnditaande 511 MW.[13][14][15]

Template:Stack

  1. "NPIM acquires stake in Australia's Stockyard Hill Wind Farm". www.power-technology.com (in Engeleere). 14 January 2020. Retrieved 2021-10-18.
  2. Template:Cite press release
  3. McLennan, Chris (21 February 2014). "Stockyard Hill wind farm to go ahead, Origin Energy says".
  4. "Origin shelves wind farm, pending review". Climate Spectator. 21 February 2014.
  5. "Stockyard Hill Wind Farm". Origin.
  6. Paton, James (15 January 2013). "Origin drops sale of Stockyard". Bloomberg.
  7. "FACTS SHEET" (PDF). Retrieved 19 October 2021.
  8. "GW140-3.57MW" (PDF). Retrieved 19 October 2021.
  9. "3S PMDD – Goldwind Australia" (in Engeleere). Retrieved 2021-10-18.
  10. "Application to amend the Wind Energy Facility Planning Permit" (PDF). Retrieved 19 October 2021.
  11. Howl, Nadia (2021-07-25). "Stockyard Hill Wind Farm a step closer to operation". Energy Source & Distribution (in Engeleere). Retrieved 2021-11-16.
  12. Cite error: Invalid <ref> tag; no text was provided for refs named Stockyard2
  13. "SCADAVALUE:DISPATCH (STOCKYD1: 511 MW of Wind in VIC1)".
  14. "eljmkt nemlog - Stockyard Hill Wind Farm (STOCKYD1)".
  15. "eljmkt nemlog - Stockyard Hill Wind Farm (STOCKYD1)".