Jump to content

Trianel Windpark Borkum

Iwde to Wikipedia
Trianel Windpark Borkum
offshore wind farm
LesdiAlmaanya Taƴto
Nder laamooreExclusive economic zone of Germany in the North Sea Taƴto
Located in or next to body of waterNorth Sea Taƴto
Jonde kwa'odineto54°2′30″N 6°28′0″E Taƴto
Owned byTrianel Taƴto
Main building contractorJan De Nul Taƴto
Connects withBorkum West II Offshore Substation Taƴto
Laawol ngol laamu anndanihttp://www.trianel-borkum.de/en/start.html Taƴto
Map

Borkum ko nokku henndu Trianel

Ko nokku henndu Trianel Borkum (hono Borkum Hirnaange II) ko nokku henndu to bannge maayo sara Borkum. Faandaare mayre adannde nde 40 turbineeji limtaaɗi e mbaawka 200 MW ina golloo, e peeje, ɓeydaare 200 MW e nder faandaare ɗiɗmere[1][source unreliable?] Eɓɓaande ndee jaɓaama ngam mahngo e hitaande 2008[2] e maa yoɓe ko ina tolnoo e €1 miliyaar ngam mahngo al €91 timmuɗo. Ko adii fof ko Borkum hirnaange II innde nde waylaa wonti Borkum nokku henndu Trianel e fuɗɗoode hitaande dubi 2013.

Faandaare 1 nde liggorde ndee joofi ko e lewru 4ɓuru hitaande 2014, ina waɗi 40 turbine Areva M5000-116 (turbine 5 MW) e dow fonndaasiyoŋ Tripod.[3] Nde jokkondiri e laylaytol ngol ko e lewru ut 2015.[4] E nder lebbi jeegom hade lewru marse 2016, tovo ngo ina soomi 452,33 GWh,[5] zum woni 51,6 %.

Doole ɗee njaltintee ko e nokku mbayliigu HVDC DolWin1 to nokku Almaañ to leydi Dörpen West sara Heede.[6]

E lewru suwee 2016 Senvion rokkaama kontraa sarɗiyankeewo ngam fawaade e daawal ɗiɗaɓal, wonande 32 turbineeji 6,2M152 moƴƴinaaɗi, tawi mbaawka mum en ina tolnoo e 203 MW. Kuulal cakkitiingal ngam waɗde heen ngalu waɗaama e feccere adannde e hitaande 2017 caggal ɗuum mahngo fuɗɗii e fuɗɗoode hitaande 2018 ngam timminde golle potɗe waɗeede e nder lewru ut 2019.[7] Feere henndu ndee fuɗɗii golle mum haa timmi e hitaande 2020 caggal nde leeltinaa sabu banke Senvion, e njoɓdi €184/MWh.[8]

  1. "Borkum West II Offshore Wind Farm, Germany". power-technology.com. Retrieved 24 January 2013.
  2. Berkenhagen, J. R.; Döring, R.; Fock, H. O.; Kloppmann, M. H. F.; Pedersen, S. R. A.; Schulze, T. (2010). "Decision bias in marine spatial planning of offshore wind farms: Problems of singular versus cumulative assessments of economic impacts on fisheries". Marine Policy. 34 (3): 733. doi:10.1016/j.marpol.2009.12.004.
  3. "Facts and figures". trianel-borkum.de. Retrieved 17 August 2013.
  4. "Germany adds lots of offshore wind".
  5. "Trianel Windpark Borkum halbes Jahr in Betrieb Erster rein kommunaler Offshore-Windpark erfüllt positive Erwartungen" [Trianel Windpark Borkum half year in operation First purely municipal offshore wind farm fulfills positive expectations]. presseportal.de (in Docceere). 2016-03-18. Retrieved 2017-03-05.
  6. "Trianel Wind Farm Borkum". Trianel GmbH (in Engeleere). Retrieved 2024-12-28.
  7. "Trianel Windpark Borkum II counts on Senvion offshore turbines". trianel.com. 2016-09-28. Retrieved 2017-03-05.
  8. "Trianel Windpark Borkum II Offshore Wind Farm - Fully Commissioned - Germany | 4C Offshore". www.4coffshore.com. Archived from the original on 9 January 2022.