Trianel Windpark Borkum
| Lesdi | Almaanya |
|---|---|
| Nder laamoore | Exclusive economic zone of Germany in the North Sea |
| Located in or next to body of water | North Sea |
| Jonde kwa'odineto | 54°2′30″N 6°28′0″E |
| Owned by | Trianel |
| Main building contractor | Jan De Nul |
| Connects with | Borkum West II Offshore Substation |
| Laawol ngol laamu anndani | http://www.trianel-borkum.de/en/start.html |

Borkum ko nokku henndu Trianel
Ko nokku henndu Trianel Borkum (hono Borkum Hirnaange II) ko nokku henndu to bannge maayo sara Borkum. Faandaare mayre adannde nde 40 turbineeji limtaaɗi e mbaawka 200 MW ina golloo, e peeje, ɓeydaare 200 MW e nder faandaare ɗiɗmere[1][source unreliable?] Eɓɓaande ndee jaɓaama ngam mahngo e hitaande 2008[2] e maa yoɓe ko ina tolnoo e €1 miliyaar ngam mahngo al €91 timmuɗo. Ko adii fof ko Borkum hirnaange II innde nde waylaa wonti Borkum nokku henndu Trianel e fuɗɗoode hitaande dubi 2013.
Faandaare 1 nde liggorde ndee joofi ko e lewru 4ɓuru hitaande 2014, ina waɗi 40 turbine Areva M5000-116 (turbine 5 MW) e dow fonndaasiyoŋ Tripod.[3] Nde jokkondiri e laylaytol ngol ko e lewru ut 2015.[4] E nder lebbi jeegom hade lewru marse 2016, tovo ngo ina soomi 452,33 GWh,[5] zum woni 51,6 %.
Doole ɗee njaltintee ko e nokku mbayliigu HVDC DolWin1 to nokku Almaañ to leydi Dörpen West sara Heede.[6]
E lewru suwee 2016 Senvion rokkaama kontraa sarɗiyankeewo ngam fawaade e daawal ɗiɗaɓal, wonande 32 turbineeji 6,2M152 moƴƴinaaɗi, tawi mbaawka mum en ina tolnoo e 203 MW. Kuulal cakkitiingal ngam waɗde heen ngalu waɗaama e feccere adannde e hitaande 2017 caggal ɗuum mahngo fuɗɗii e fuɗɗoode hitaande 2018 ngam timminde golle potɗe waɗeede e nder lewru ut 2019.[7] Feere henndu ndee fuɗɗii golle mum haa timmi e hitaande 2020 caggal nde leeltinaa sabu banke Senvion, e njoɓdi €184/MWh.[8]
Tuugnorgal
[taƴto | taƴto ɗaɗi wiki]- ↑ "Borkum West II Offshore Wind Farm, Germany". power-technology.com. Retrieved 24 January 2013.
- ↑ Berkenhagen, J. R.; Döring, R.; Fock, H. O.; Kloppmann, M. H. F.; Pedersen, S. R. A.; Schulze, T. (2010). "Decision bias in marine spatial planning of offshore wind farms: Problems of singular versus cumulative assessments of economic impacts on fisheries". Marine Policy. 34 (3): 733. doi:10.1016/j.marpol.2009.12.004.
- ↑ "Facts and figures". trianel-borkum.de. Retrieved 17 August 2013.
- ↑ "Germany adds lots of offshore wind".
- ↑ "Trianel Windpark Borkum halbes Jahr in Betrieb Erster rein kommunaler Offshore-Windpark erfüllt positive Erwartungen" [Trianel Windpark Borkum half year in operation First purely municipal offshore wind farm fulfills positive expectations]. presseportal.de (in Docceere). 2016-03-18. Retrieved 2017-03-05.
- ↑ "Trianel Wind Farm Borkum". Trianel GmbH (in Engeleere). Retrieved 2024-12-28.
- ↑ "Trianel Windpark Borkum II counts on Senvion offshore turbines". trianel.com. 2016-09-28. Retrieved 2017-03-05.
- ↑ "Trianel Windpark Borkum II Offshore Wind Farm - Fully Commissioned - Germany | 4C Offshore". www.4coffshore.com. Archived from the original on 9 January 2022.