Veligonda Project
Nder laamoorePrakasam district Taƴto
Jonde kwa'odineto15°46′6″N 79°10′50″E Taƴto
Map

Eɓɓaande Veligonda ko eɓɓaande ndiyam tawaande to Markapur, diiwaan Prakasam to leydi Indiya. So eɓɓaande ndee gasii, maa rokku 447 000 ektaar nokkuuji ndiyam njareteeɗam e ndiyam njareteeɗam 1,5 miliyoŋ neɗɗo e nder 30 Mandal e nokkuuji ɗo fluoride e yooro toɗɗii e nder diiwaan Prakasam, diiwaan Nellore e diiwaan Kadapa e diiwaan Kadapa, tawa ina ustoo 43,5 TMC ndiyam maayo Krishshoiar e nder nerisao S Kollamvagu e eɓɓaande ngam mooftude e nder weendu Nallamalasagar. Ndiyam eɓɓaande ndee ina ƴettee e nder ɓulli ɗiɗi njuuteendi 18,8 km e nder tule Nallamala. [1] ndee innitiraa ko "Eɓɓaande ndiyam Poola Subbaiah". Nde diwti ko ina tolnoo e 20 946 galle.[6] Ostees en ɓee ceppii ngam ɓeydude njoɓdi mum en e nder duuɓi ɗi, heewɓe keɓaani njoɓdi fodanoondi ɓe ndii.[2]

Eɓɓoore Veligonda

Wikimedia | © Kartal laabi udditiiɗi

Komponenteeji eɓɓoore Veligonda ina njuɓɓinaa e kartal

Desin oo ina waɗi tunneluuji ɗiɗi gonɗi e 18,8 km e 7 m (tunnel 1) e 9,2 m (tunnel 2) njaajeendi nder mum e 21,6 km kanndaa ɓuuɓɗo ngam njuɓɓudi jolngo ndiyam jokkondirndi e weendu Srisailam e weendu wiyeteendu ‘Nallamala Sagar’. Nallamala Sagar ina foti jogaade 43,5 Tmcft e nder njuuteendi 244 m msl to senngo tovo ngo e 214,3 m msl to senngo tovo ngo. Tolno timmuzo e tovo ngo gila e tovo ngo Srisailam ko 857 ft msl (261,2 m msl) e tolno sill to naatgol ndiyam tovo ngo ko 840 ft msl (256,03 m msl).[3]

Irrigaasiyoŋ haa 1,19 lakh ektaar e ndiyam njareteeɗam haa 4 lakh yimɓe e nder diiwaan Prakasam ina peewnitee e nder daawal gadanal ngal. E nder daawal ɗiɗaɓal, ndiyam ɗam haa 3,28 miliyoŋ ektaar e ndiyam njareteeɗam haa 11,25 miliyaar yimɓe e nder 30 mandal e nder diiwanuuji Prakasam, Nellore e Kadapa ina peewnitee. Eɓɓaande ndiyam lift Velagalapalle, eɓɓaande ndiyam lift Papinenipalli ina njeyaa kadi e eɓɓaande ndee. Fotde 2,58 TMC ndiyam feewde e nokku gollordu mawndu to Donakonda e nder diiwaan Prakasam e ndiyam 1,27 TMC goɗɗo e nokku njulaagu e peewnugol (NIMZ) e nder Pamuru e mandals Pedacherlopalle e nder diiwaan Prakasam ina njeyaa kadi e mbaadiiji yaajɗi eɓɓaande ndee.[4]

Hayre gonnde e ndee eɓɓaande ko Nara Chandra babu Naidu lelni ɗum e hitaande 2003. Pewnugol eɓɓaande ndee ina jokki e laamu Kongres AP mo feccaaka e hitaande 2006. Nde laamuuji jokkondirɗi ndokkaani kaalis potɗo, yahrude yeeso yanii e laawol. Kontrakteruuji bagginoozi eɓɓaande ndee kadi ina mettini heen no feewi sabu caɗeele waɗde tunwuɗe ɗee e nokkuuji ɓurɗi tiiɗde ɗii. Tunnel-1 mo njuuteendi mum tolnii e 18,787 km, timminaama e njuuteendi 13,6 km e hitaande 2018. Hay so tawii noon ko hedde 5 km tan heddii e vursugol ngol, departemaa ndiyam ina waawi timminde tan ko hedde 2 km hakkunde 2019 e 2023.[5]

Eɓɓaande ndee ina huutoree e masiŋ ɓuuɓɗo tunnel mo kaɓirɗe ɗiɗi ngam waɗde tunnel ngel tawa ina ustoo kullon ladde e nder nokku keeriiɗo biyeteeɗo Nagarjunsagar-Srisailam.[6]

18,2 km (11,3 mi) e tunnel gadanol ngol, e 11,02 km (6,85 mi) e tunnel ɗiɗaɓol ngol, timmaama haa lewru Yarkomaa 2025. Tunnel gadano oo timminaama gila 14 lewru Yarkomaa 2021. Njuuteeki tunnel ɗiɗaɓol heddii ngol timminaama e kuutoragol ɓuuɓgol al2 diamètre e nokku 9,2 m ina uddita laawol ngam hebbinde lowre eɓɓaande ndee.[7]

Haa lewru ut 2025, fotde 4000 miliyaar ugiyya golle ina njokki ngam hebbinde lowre sagar Nallamalla. Haa jooni e lewru suwee 2025, laamu AP ina jogori timminde eɓɓaande ndee e dow sarɗiiji toowɗi, tawa ina yaltina denndaangal kaalis potɗo huutoreede.Nñalngu nguu ina ɗaminaa maa hebbine reservoir oo ko e lewru ut 2026 so tawii golle potɗe waɗeede ɗee fof njoofiima no haanirta nii.[8]

Waktuuji eɓɓoore ndee

[taƴto | taƴto ɗaɗi wiki]

Jaɓgol njuɓɓudi laamu 2004-07-09

[taƴto | taƴto ɗaɗi wiki]

Tender 15 lewru nduu 2005

[taƴto | taƴto ɗaɗi wiki]

Sanksiyoŋ karallaagal 2006-05-19

[taƴto | taƴto ɗaɗi wiki]

Golle tunnel e kanndaa jokkondirɗo ina ɗaminaa maa timmu haa 2026-07-31

[taƴto | taƴto ɗaɗi wiki]

Ndiyam yaltinaama e lewru ut 2026

[taƴto | taƴto ɗaɗi wiki]
  1. "AP CM Shri Nara Chandrababu Naidu inspecting the construction of Veligonda Project". The Rahnuma Daily (in Engeleere). 2018-11-03. Retrieved 2020-03-13.
  2. "Poola Subbaiah Veligonda Project". Irrigation dept, Govt. of A.P. Archived from the original on 5 July 2022. Retrieved 9 August 2020.
  3. Rao, M. Malleswara (2013-03-25). "The Hindu: Work on Veligonda project resumes". The Hindu. TheHindu.com.
  4. "Government to focus on Polavaram rehabilitation and resettlement". The New Indian Express. 2022-03-30. Archived from the original on 2022-04-04. Retrieved 2022-06-09.
  5. "Poola Subbaiah Veligonda Project". Archived from the original on 5 July 2022. Retrieved 9 August 2020.
  6. "Poola Subbaiah Veligonda Project". Archived from the original on 5 July 2022. Retrieved 9 August 2020.
  7. "Jagan Mohan Reddy to inaugurate Veligonda project twin tunnels today". The New Indian Express. 2024-03-06.
  8. "15 Years On, AP Families Displaced by Veligonda Project Fight for Fair Compensation". Land Conflict Watch. Archived from the original on 2022-02-14. Retrieved 2022-06-09.