Wolf Wind Farm ko eɓɓaande henndu nde Red Rocket ƴettata, ina woni 5km to fuɗnaange Wolwefontein to Kap fuɗnaange, Afrik worgo. Jooni noon, nde woni ko e mahde, nde ina ɗaminaa nde joofnata ko e Q4 2024. So nde fuɗɗiima golleede, ndeen nokku ina waawi waɗde ko ina tolnoo e 360GWh hitaande kala.[1] Ina ɗaminaa maa ɗum ustoy 384 000 ton CO2 hitaande kala.[2][3]
Feere henndu ndee maa huutoro turbineeji sappo e jeeɗiɗi ɗi Vestas peewnata. Ina jeyaa heen masiŋaaji joy doole V162-6.2MW e masiŋaaji sappo e ɗiɗi V163-4.5MW, tawi mbaawka mum en hawri ko 85MW.[4]
Red Rocket heɓi eɓɓaande ndee ko e porogaraam laamu Afrik worgo ngam soodde semmbeeji kesi e nder Bid Window 5.[5][6]
Tuugnorgal
[taƴto | taƴto ɗaɗi wiki]- ↑ Kuhudzai, Remeredzai Joseph (30 March 2023). "Construction Of 84 MW Wolf Wind Project In The Eastern Cape, South Africa Has Started". CleanTechnica. Retrieved 22 May 2024.
- ↑ Wahl, ed. (7 December 2023). "Sonia". Graaff-Reinet Advertiser.
- ↑ Madiba, Dimpho (26 February 2024). "Wolf Wind Farm project advances swiftly with Concor". Engineering News. Retrieved 22 May 2024.
- ↑ Chandak, Pooja (3 October 2023). "South African IPP Red Rocket Secures $160 Million To Expand Renewable Energy Ventures". SolarQuarter. Retrieved 22 May 2024.
- ↑ Markosyan, Martina (29 March 2023). "Construction of S Africa's 84-MW Wolf Wind project kicks off".
- ↑ Moodley, Neesa (29 March 2023). "Wolf Wind project in Eastern Cape breezes one step closer to generating power for national grid". Daily Maverick. Retrieved 22 May 2024.